Two workers operate a tunneling machine at a Metro Line 7 construction site Thursday. The 30-km line, which will run from Lishui Road, Nanshan District to Tai’an Road, Luohu District, will open in September 2016.Sun Yuchen
深圳报业集团版权所有, 未经授权禁止复制; Copyright 2010, All Rights Reserved.
Shenzhen Daily E-mail:szdaily@szszd.com.cn