Construction on the major structure of Shuangyongjie Metro Station was finished Sunday. The 710-meter-long station, the longest Metro station under construction in Asia, is the departure station of Metro Line 10 connecting Pinghu Subdistrict of Longgang District to the city’s main urban area. The station will have 19 entrances and exits. At present, the construction of Metro Line 10 is progressing smoothly, as 95 percent of the line’s main structure has been completed. The Metro line is expected to start a trial operation in 2020. Sun Yuchen |