snow removal drill is launched on the Jiaozhou Bay Bridge to ensure safe operation in bad weather. It will be the first winter since the bridge was put in operation and there may be heavy snow and thick ice. The drill is to test the bridge’s skid resistance and staff’s ability to handle emergencies. Fu Xuejun |