-
Important news
-
News
-
Shenzhen
-
China
-
World
-
Opinion
-
Sports
-
Kaleidoscope
-
Photos
-
Business
-
Markets
-
Business/Markets
-
World Economy
-
Speak Shenzhen
-
Health
-
Leisure
-
Culture
-
Travel
-
Entertainment
-
Digital Paper
-
In-Depth
-
Weekend
-
Newsmaker
-
Lifestyle
-
Diversions
-
Movies
-
Hotels and Food
-
Special Report
-
Yes Teens!
-
News Picks
-
Tech and Science
-
Glamour
-
Campus
-
Budding Writers
-
Fun
-
Qianhai
-
Advertorial
-
CHTF Special
-
Futian Today
在线翻译:
szdaily -> Shenzhen -> 
Qianhai underground road starts operation
    2021-07-13  08:53    Shenzhen Daily

Han Ximin

1824295095@qq.com

PHASE I of the underground road project of Guiwan No. 1 Road, Linhai Boulevard and Binhai Boulevard was put into operation Friday.

The underground road project links Phase II of Nanping Expressway and Binhai Boulevard in the east and Guangzhou-Shenzhen Riverside Expressway in the south. It is a fast, underground traffic network connecting Qianhai with Nanshan, Longhua and Longgang.

The underground road system is planned at 9.81 kilometers. It has 33 underground parking lots offering 15,000 parking places.

With the opening of the main line project, the auxiliary lines will be put into operation soon.

The 3.03-kilometer underground section of Guiwan No. 1 Road and Linhai Boulevard was designed at 50 kilometers per hour. The 1.28-kilometer underground section of Binhai Boulevard was designed at 80 kilometers per hour.

Drivers from Shahe West Road can now drive to the underground road through Phase II of Nanping Expressway. Drivers exiting from the underground road can reach Binhai Boulevard and Guangzhou-Shenzhen Riverside Expressway. The whole trip takes about 15 minutes.

深圳报业集团版权所有, 未经授权禁止复制; Copyright 2010-2020, All Rights Reserved.
Shenzhen Daily E-mail:szdaily@126.com