-
Important news
-
News
-
Shenzhen
-
China
-
World
-
Opinion
-
Sports
-
Kaleidoscope
-
Photos
-
Business
-
Markets
-
Business/Markets
-
World Economy
-
Speak Shenzhen
-
Health
-
Leisure
-
Culture
-
Travel
-
Entertainment
-
Digital Paper
-
In-Depth
-
Weekend
-
Newsmaker
-
Lifestyle
-
Diversions
-
Movies
-
Hotels and Food
-
Special Report
-
Yes Teens!
-
News Picks
-
Tech and Science
-
Glamour
-
Campus
-
Budding Writers
-
Fun
-
Qianhai
-
Advertorial
-
CHTF Special
-
Futian Today
在线翻译:
szdaily -> Business/Markets -> 
Pioneering nuclear reactor starts operation
    2021-12-22  08:53    Shenzhen Daily

CHINA has launched a new high-temperature gas-cooled nuclear plant in the eastern coastal province of Shandong, the first in the world to make use of “pebble bed reactor” (PBR) technology developed by China National Nuclear Corp. (CNNC).

The first unit of the Shidaowan reactor project, built near the city of Rongcheng in collaboration with the energy group Huaneng and Beijing-based Tsinghua University, has now been connected to the grid, CNNC said Monday.

The unit has total generation capacity of around 200 megawatts, and a second unit is still under construction.

In PBR technology, the reactor core is formed from graphite pebbles that contain specially designed fuel particles. The design allows reactors to be run safely at higher temperatures, CNNC said, describing it as “the reactor that won’t melt down.”

China Daily yesterday quoted an unnamed analyst as saying that the Shidaowan reactor project marks China’s mastery over the fourth-generation nuclear energy system.

The fourth-generation nuclear energy system is considered relatively safer as it requires no water for cooling.

China is one of the few countries in the world with an active nuclear reactor program, but it has sought to meet its construction targets after a moratorium on new projects and a long safety probe following Japan’s Fukushima disaster in 2011.

Total capacity hit 51 gigawatts (GW) by the end of last year, falling short of a 58 GW target. CNNC has urged the government to approve at least six new projects a year over the next decade in order to bring total capacity up to 180 GW by 2035.

CNNC said the technology employed at the Shidaowan project was completely homegrown, with 93.4 percent of all the equipment also sourced domestically. (SD-Agencies)

深圳报业集团版权所有, 未经授权禁止复制; Copyright 2010-2020, All Rights Reserved.
Shenzhen Daily E-mail:szdaily@126.com